Sand AISand AI MAGI-2MAGI-2 现已上线 SandBase:支持原生音频的 1080p 视频立即试用

Polygon Bridge

Connect two photographs through diagonal shutters and an editorial title bridge.

示例 · 2

在线运行

免费

在 SandBase sandbox 中运行 Polygon Bridge 的示例,并在这里查看结果。

工作原理

  1. 01

    Prepare two images

    Polygon Bridge takes two licensed local raster images and a before and after brief, kept beside the brief or given as absolute paths. Choose images that communicate the change; if a suitable image is missing, say so, since paid generation requires authorisation.

  2. 02

    Bridge with shutters

    In a fixed 6.8-second timeline, two opaque complementary triangles enter from opposite corners and switch content only under full cover at 1.22 and 4.22 seconds. Between the before and after photographs, an editorial title bridge carries the change in words.

  3. 03

    Build, check and render

    build.mjs writes a new project with local images, fonts, GSAP, editable HTML and hashes. Install the pinned renderer, run hyperframes check and a strict render with one worker, then inspect frames densely around both shutter switches and play at normal speed. Both samples are silent.

常见问题

What does Polygon Bridge make?

Polygon Bridge makes a 6.8-second before-and-after transition: two photographs connected by diagonal triangle shutters and an editorial title bridge. It suits short explainers such as ingredients becoming a baked dish, or a blueprint becoming a living space.

When do Polygon Bridge images switch?

Polygon Bridge switches content only while the two triangles fully cover the frame, at 1.22 and 4.22 seconds, so no half-changed image is ever seen. Review frames densely around both moments to confirm the cover is complete.

What if I have no image for Polygon Bridge?

Polygon Bridge requires two licensed images and has no generation step. If an appropriate image is missing, the guidance is to disclose the gap; generating one through a paid service needs your explicit authorisation first.

Does Polygon Bridge need a paid service?

No. Polygon Bridge renders locally with Node 22, Chrome, FFmpeg and a pinned HyperFrames, and makes no model or paid call. Fonts, GSAP and your images are copied into each project.

Can I change Polygon Bridge timing?

No. Polygon Bridge preserves its 1920 by 1080, 30 fps, 6.8-second timeline. To revise content, edit the brief and build into a fresh folder; a new structure needs its own authored composition.